Take a look at some of our recent projects
Residential
Project Location:
Claremont Park, Esher
Project Size:
Undisclosed
Services Value:
Undisclosed
Project Description:
Pre-acquisition Survey
Services Provided:
Non-intrusive site survey, flow rate and pressure check.
Services design.
Review of certificates and O&M manuals.
Services coordination.
Issue of findings reports and snagging list.
Site inspections.
Remedial works inspection and sign off.
Commissioning and sign off.
​
Project Location:
Surrey
Project Size:
Undisclosed
Services Value:
Undisclosed
Project Description:
Services design for a luxury high specification private residence.
Services Provided:
Services design.
Review of certificates and O&M manuals.
Services coordination.
Issue of findings report and snagging list.
Site inspections.
Remedial works inspection and sign off.
Commissioning and sign off.
Project Location:
South West London
Project Size:
1,352m²
Services Value:
Undisclosed.
Project Description:
New build residential property over five levels, consisting of Cinema, Bar, Swimming Pool, Jacuzzi, Gym, Wine Cellar, multiple reception rooms and five bedrooms.
Services Provided:
- iTS were appointed to review the contractors Stage 4 and 5 design and build proposals and provide advice on all MEP services.
- iTS had substantial on site presence over a period of 4 years to attended progress meetings with the client and project team, site inspections and witnessing commissioning.
​
Project Location:
Hermitage Lane, Hampstead Heath, London
Project Size:
630m² per house (two twin houses)
Services Value:
Undisclosed
Project Description:
New development of two twin homes located on Child's Hill offers high specification luxury accommodation. Arranged over four levels, the homes boast a fully equipped cinema room, four double bedrooms and three bathrooms.
Services Provided:
Design from RIBA Stage 2 through to RIBA Stage 4 for all MEP services.
The design included electrical distribution, external lighting, internal lighting, small power, data, access control, fire alarm, heating, water services, ventilation and above ground drainage.
The design met with The Code for Sustainable Homes level 3. This included implementing gas flue heat recovery, waste water heat recovery and mechanical ventilation with heat recovery.
Multi Residential
Project Location:
313-315 Caledonian Road, Islington
Project Size:
7 Apartments and Landlords Space
Services Value:
Undisclosed
Project Description:
Conversion and extension of and existing building to form 7 high quality apartments and amenity space.
Services Provided:
Design from RIBA Stage 2 through to RIBA 3 for all MEP services.
Incoming utilities (Gas, Water, Telecoms, Electricity). Electrical distribution, Lighting, Power, Fire alarms, Data, Access control, Heating, Ventilation, Domestic water services, Above ground foul and rainwater drainage.
Project Location:
Salisbury Square, Hatfield, AL9 5AF
Project Size:
1,760m²
Services Value:
Approximately £1,000,000
Project Description:
25 new apartments
Services Provided:
-Design from RIBA Stage 2 through to RIBA Stage 5 & 6 for all MEP services.
BRUKL SAP calculations. Incoming utilities. (Gas, Water, Telecoms, Electricity). Disconnections and new. Electrical distribution, Lighting, Power, Fire alarms, Data, Access control, Heating, Ventilation, Domestic water services, Above ground foul and rainwater drainage.
iTS had substantial on site presence over a year and a half, attending site progress meetings with the client and project team, site inspections and witnessing commissioning.​
Project Location:
Thompsons Close, Harpenden, AL5 4ES
Project Size:
608m², three bedroom apartments.
Services Value:
Undisclosed
Project Description:
The project consisted of an extension, conversion and change of use of an existing building containing office and retail space to form multiple luxury apartments.
Services Provided:
Design from RIBA Stage 2 through to RIBA Stage 3 for MEP services.
iTS reviewed the existing site, designed and made applications for all incoming utility services. The design included detailed room data sheets covering electrical distribution, external lighting, internal lighting, small power, data, access control, fire alarm, heating, water services and ventilation.
iTS had site presence including attending meetings with the client to discuss the design and to discuss utilities with the district network operators.
Project Location:
Catherine Street, St Albans, AL3 5BJ
Project Size:
175m² (Ground Floor Retail)
545m² (First and Second Floor Apartments)
Services Value:
Undisclosed.
Project Description:
The project consisted of an infill, conversion and change of use of an existing building to form a retail space and multiple apartments.
Services Provided:
Design from RIBA Stage 2 through to RIBA Stage 3 for all MEP services.
iTS reviewed the existing site, designed and requested quotations from all utility network operators, ultimately requiring a local substation upgrade.
A heating analysis was undertaken and electric heating chosen, saving the client the substantial costs of upgrading the local gas network. The design included electrical distribution, external lighting, internal lighting, data & AV (provisions only), small power, data, access control, fire alarms, heating, water services, ventilation and above ground drainage. ​
Project Location:
The Quadrate, Ruislip,HA6
Project Size:
23 Apartments, Landlords and Commercial Space
Services Value:
Undisclosed
Project Description:
The Quadrate raises the bar in the area for contemporary living. Intricately considered to maximise space and the flow of natural light, each apartment is framed by high ceilings, anthracite grey double-glazed windows and light oak vinyl flooring. Many of the new homes also feature private outdoor amenity space and oversized windows.
Services Provided:
Design from RIBA Stage 2 through to RIBA Stage 5 & 6 for all MEP services.
BRUKL SAP calculations. Incoming utilities. (Gas, Water, Telecoms, Electricity). Disconnections and new. Electrical distribution, Lighting, Power, Fire alarms, Data, Access control, Heating, Ventilation, Domestic water services, Above ground foul and rainwater drainage.
Project Location:
The Vale, Riegate,RH2
Project Size:
42 Apartments, Landlords and Commercial Space
Services Value:
Undisclosed
Project Description:
Each home is intricately considered to maximise space and the flow of natural light, framed by high ceilings, anthracite grey double-glazed windows – many of which include striking inset bays, and light oak vinyl flooring. Every apartment has intelligently designed open-plan layouts with light grey walls complimented by flush white doors and trending matt black details
Services Provided:
Design from RIBA Stage 2 through to RIBA Stage 5 & 6 for all MEP services.
BRUKL SAP calculations. Incoming utilities (Gas, Water, Telecoms, Electricity). Electrical distribution, Lighting, Power, Fire alarms, Data, Access control, Heating, Ventilation, Domestic water services, Above ground foul and rainwater drainage. EPC's.​
Commercial
Commercial
Project Location:
Ignite Gym, Cuffley, EN6 4RY
Project Size:
652m²
Client:
Ignite.
Services Value:
Undisclosed.
Project Description:
Full ventilation design of Ignite Gym.
Services Provided:
Full design of ventilation services alongside in depth calculations for ventilation rates required and index runs for the static pressure of the system.
Liaising with contractor for co-ordination and queries.​
Project Location:
Entain, One Stratford Place, Olympic Village
Project Size:
3,716m²
Client:
Entain. Entain plc (LSE: ENT) is the FTSE 100 company that is one of the world's largest sports betting and gaming groups operating in the online and retail sector. Via our unique proprietary technology platform, we offer sports betting, casino, poker and bingo online and operate some of the industry's most iconic brands including Ladbrokes,Coral, BetMGM, bwin, Sportingbet, Eurobet, partypoker, partycasino, Gala and Foxy Bingo.
Services Value:
£1.3M
Project Description:
40,000 sq ft pilot office at One Stratford Place, London.
Services Provided:
Design from RIBA Stage 3 for heating, domestic water services, cooling, ventilation services, electrical distribution, small power, data, lighting and fire alarms.
Continuing to stage 5 for heating, cooling, ventilation, domestic water services and above ground drainage.
Design of a building services handover schedule to outline required test/commissioning, with attendance at site to view test/commissioning results.
In-depth design of roof mechanical services.
Project Location:
Acacium London, 9 Appold St, London EC2A 2AP
Project Size:
2,601m²
Client:
Acacium
Services Value:
£900,000
Project Description:
Multitude of offices for the 20 brands under the Acacium Group's umbrella. iTS progressed the Cat A fit out to a CAT B.
Services Provided:
Design from RIBA Stage 1 through to RIBA Stage 6.
Validation survey for Stage 1, validating all HVAC equipment.
Full design of power & data, fire alarms, AV, electrical distribution, access control, lighting, heating, ventilation, air conditioning and domestic water services while also utilising the existing system where possible.
Full co-ordination on site, working with architectural and structural information.
Tender reviews.
Site attendance during MEP fit-out stage and review of fitted drawings and commissioning information.
​
Project Location:
25 Berkeley Square, Mayfair, London W1J 6HN
Project Size:
5,130m²
Client:
Lazari Investments Limited.
Services Value:
Undisclosed.
Project Description:
Berekeley Square is one of London's most prestigious addresses, the jewel in Mayfairs Crown. Shell and core CAT A was provided to both the retail units and offices within the building. With the building being Grade II listed.
Services Provided:
Witnessing and commissioning managers for the shell and core CAT A fit-out.
Weekly attendance to review progress and assist in service management.
Managing M&E installation, sub-contractors and final witnessing and commissioning.
Managed utility upgrades and installations.
Review of commissioning, snagging and witnessing schedules.
Project Location:
The HUB, Kent Science Park, Woodstock House, Winch Road, Sittingbourne,
ME9 8EF
Project Size:
900m²
Client:
KSP. Kent Science Park is a developing cluster for innovative companies focusing on agri-tech, biotech, biopharma and more. The park has a history of innovation – including Nobel Prize winning discoveries – and was awarded the UKSPA Best Life Science Research Facility in South East England in 2016.
Services Value:
Undisclosed.
Project Description:
The HUB at Kent Science Park is a new build social and collaborative heart of Kent Science Park. It hosts Eco-Village restaurant, meeting rooms and office space.
Services Provided:
Design from RIBA Stage 2 through to RIBA Stage 4 for all MEP services.
During the design stages iTS instructed and managed the acquisition of a below-ground PAS128 survey, this survey highlighted the need to re-route a site wide medium temperature hot water service, along with multiple other utilities. All new incoming utilities were managed by iTS, which included a number of on site meetings with the utility providers.
iTS attended various coordination meetings with the architect, client and specialist sub-contractors to ensure all elements were managed and accounted for within iTS’s tendered design. iTS had bi-weekly presence on site to attended progress meetings with the project team along with site inspections to monitor that the works were being carried out in line with the current drawings, schedules and specification. This included attendance with various commissioning engineers to ensure the system was operating as designed.
​
​
Project Location:
Funko, European HQ, 1 Queen Caroline St, Hammersmith, London
Project Size:
1500m²
Client:
Funko is one of the leading creators and innovators of licensed pop culture products to a diverse range of consumers.
Services Value:
Undisclosed.
Project Description:
The project was Funko’s European head office. This all new fit out consisted of open-plan, collaborative working space for the Funko team, conference rooms, breakout area. Its centerpiece is a showroom exhibiting many of Funko’s new and upcoming products.
Services Provided:
Design from RIBA Stage 2 through to RIBA Stage 4 for MEP services.
During the design stages iTS liaised with the buildings landlords team to ascertain the provided CAT A provisions along with the interface processes and procedures. This included a number of meeting with the landlords team to gain sign-off on the services design.
iTS attended various coordination meetings with the architect,
client and specialist sub-contractors to ensure all elements were managed and accounted for within iTS’s tendered design. This included coordination with sprinklers and access control specialist contractors.
iTS had weekly presence on site to attended progress meetings with the project team along with site inspections to monitor that the works were being carried out in line with the current specification. This included attendance with various commissioning engineers to ensure the system was operating as designed.
​
​
Project Location:
70 Mark Lane, London EC3R 7HT
Project Size:
2500m²
Client:
Crawford & Company. Crawford & Company is the
world’s largest independent claims management company,
with more than 700 offices in 70 countries.
Services Value:
£780,000
Project Description:
CAT B office fit-out over three floors including grand reception area, flexible meeting rooms, individual offices, open plan office spaces, tea points, comms room and outside terrace space.
Services Provided:
Design from RIBA Stage 2 through to RIBA Stage 4 for MEP services.
During the design stages iTS coordinated with the buildings landlord to ascertain the CAT A provisions along with the interface procedures.
iTS attended various coordination meetings with the architect, client and specialist subcontractors to ensure all elements were managed and accounted for within iTS’s tendered design. This included coordination with sprinklers, gas suppression, audio visual and access control specialist contractors.
​
​
Project Location:
88 Wood Street, London, EC2V 7AJ
Project Size:
1200m²
Client:
R.R. Donnelley. R.R Donnelley is an American Fortune 500 integrated communications company that provides marketing and business communications, commercial printing, and related services.
Services Value:
£850,000
Project Description:
Refit of an existing office floor for a new tenant. The floor consisted of reception area, meeting rooms, individual offices, chat pods, open plan office spaces, break out areas, kitchen, showers, toilets and comms rooms.
Services Provided:
Design from RIBA Stage 2 through to RIBA Stage 4 for MEP services.
During the design stages iTS liaised with the buildings landlord and managing agent to understand the existing installation, as existing record information was limited, and unreliable.
The desire from the client was to retain as much of the existing services as possible, this required working with various contractors, generating a scope for condition surveys and reviewing and interpreting the results. This then enabled iTS to compile the required remedial work, along with the tender design detailing the altered and new services requirements to suit the architectural arrangement.
iTS had bi-weekly presence on site to attended progress meetings with the project team along with site inspections to monitor that the works were being carried out in line with the current drawings, schedules and specification.
Project Location:
1 Queen Caroline St, Hammersmith, London, W6 9YN
Project Size:
1500m²
Client:
Funko. Funk is one of the leading creators and innovators of licnesed pop culture products to a diverse range of consumers.
Services Value:
Undisclosed
Project Description:
The project was Funko’s European head office. This all new fit out consisted of open-plan, collaborative working space for the Funko team, conference rooms, breakout area. Its centrepiece is a showroom exhibiting many of Funko’s new and upcoming products.
Services provided:
Design from RIBA Stage 2 through to RIBA Stage 4 for MEP services.
During the design stages iTS liaised with the buildings landlords team to ascertain the provided CAT A provisions along with the interface processes and procedures. This included a number of meeting with the landlords team to gain sign-off on the services design.
iTS attended various coordination meetings with the architect, client and specialist sub-contractors to ensure all elements were managed and accounted for within iTS’s tendered design. This included coordination with sprinklers and access control specialist contractors.
iTS had weekly presence on site to attended progress meetings with the project team along with site inspections to monitor that the works were being carried out in line with the current specification. This included attendance with various commissioning engineers to ensure the system was operating as designed.
Project Location:
Marina House, South Maudsley
Project Size:
Undisclosed
Services Value:
Undisclosed
Project Description:
NHS Health Clinic.
Services Provided:
Survey and condition report.
Feasibility study and report on replacement lighting, heating, cooling and ventilation systems.
Design of replacement lighting, heating, cooling and ventilation systems.
Site visits throughout the construction, including witness commissioning a
Project Location:
Hanover Square, London
Project Size:
Undisclosed
Client:
Undisclosed
Services Value:
Undisclosed
Project Description:
Feasibility study and concept design for recording studio in listed building.
Services Provided:
3D modelling. Services design. Site inspections.
Project Location:
Chancerygate Buisness Centre, Hemel Hempstead
Project Size:
Undisclosed
Client:
Immedia Imaging
Services Value:
Undislcosed
Project Description:
Complete fit out design including M&E services
Services Provided:
Project management.
Services Design.
Site inspections.
Commissioning and sign off.
Retail
Project Location:
Livat Mall & Lidl, Kings Street, Hammersmith, London
Project Size:
22,700m² & 1,711m² respectively.
Client:
Ingka, with there core business being IKEA Retail. Consisting of 392 IKEA stores across 32 markets, and counting. Each year, they welcome 657 million visitors to these stores.
Services Value:
Undisclosed.
Project Description:
Previously known as Kings Mall, this offers a multitude of shops provided by Ingka, with specific focus on the design of a new Lidl micro-store. As well as infrastructure for the whole mall.
Services Provided:
RIBA Stage 4 design shell and core to accommodate the new Lidl store.
The Stage 4 includes above ground drainage, incoming services and frame services.
Infrastructure upgrades and management of utilities for Ingka Kings Mall.
Project Location:
Metro Bank 30+ locations throughout the UK.
Project Size:
Ranging from 300m2 to 1800m²
Client:
Metro Bank. Metro Bank a retail and commercial bank founded in 2010. At its launch it was the first new high street bank to launch in the United Kingdom in over 150 years.
Services Value:
Ranging from £450,000 to £1.2 Million.
Project Description:
The majority of the Metro Bank stores consist of a large retail banking area, office and lounge spaces. The regional stores however consist of training rooms, call centres, office space, meeting rooms, kitchens, breakout areas, comms and electrical rooms. The projects have covered refurbishment of existing buildings, including listed buildings and new buildings. iTS have been involved in four of the large (in excess of 1,100m2) regional stores where the MEP services element of the contract value was in excess of £1 Million.
Services Provided:
Design from RIBA Stage 2 through to RIBA Stage 4 for all MEP services.
During the design stages iTS are a key team member coordinating with all members of the design team, along with planners, building control, landlords and managing agents.
iTS attended various coordination meetings with the architect, client and specialist sub-contractors to ensure all elements were managed and accounted for within iTS’s tendered design. This includes incoming utilities, coordination with sprinklers, signage, audio visual and access control specialist contractors.
iTS had a weekly presence on site to attended progress meetings with the project team along with site inspections to monitor that the works were being carried out in line with the current drawings, schedules and specification.​
Project Location:
New Balance, Bicester Village, 50 Pingle Dr, Bicester OX26 6WD
Project Size:
240m²
Client:
New Balance Athletics, Inc., best known as simply New Balance, is an American multinational corporation based in the Boston, Massachusetts area. The company was founded in 1906 as the “New Balance Arch Support Company” and is one of the world’s major sports footwear and apparel manufacturers.
Services Value:
Undisclosed.
Project Description:
New Balance Outlet Boutique is located in Bicester Village. Bicester Village is home to more than 160 boutiques of leading brands. On your visit you’ll find everything from chic restaurants to creative pop-ups and art exhibitions – plus a range of VIP services for an effortless shopping experience.
Services Provided:
Design from RIBA Stage 2 through to RIBA Stage 4 for all MEP services.
During the design stages iTS liaised with the Bicester Village design team to ensure every part of the M&E design complied with the fit out and branding requirements.
iTS had weekly presence on site to attended progress meetings with the project team along with site inspections to monitor that the works were being carried out in line with the current drawings, schedules and specification.
Attendance with various commissioning engineers to ensure the system was operating as designed. Attendance for snagging and sign off visits.
​
Project Location:
Beck Retail Park, Wakefield
Project Size:
Largest retail park in Wakefield anchored by 69,000 sq ft Sainsbury's. Other occupiers include The Range, Floorstore, Jollyes, Home Bargains, Matalan & B&M.
Client:
McLaren Construction
Services Value:
Undisclosed
Project Description:
Full refurbishment of existing retail park
Services Provided:
Statutory services diversions
Sub-station relocation
Car park lighting design
Landlord's services
Project Location:
The Fort Shopping Park, Birmingham, B24 9FP
Project Size:
29,218m² retail space
Client:
The Fort Retail Park Trust. The Fort Shopping Park, to the north east of Birmingham City Centre, one of the top five performing parks in the country.
Services Value:
Undisclosed
Project Description:
The shopping park consists of 40 brands and 8 food consents.
Significant investment to further enhance the success of the park and transform the shopping experience with a more open and contemporary feel, utilising double height shopfronts and a new high level canopy feature.
iTS have currently completed the first few phases of the programme. The parks ambition is to roll out the design principles across the remainder of the shopping park with an aim for completion in 2020.
Services Provided:
Design from RIBA Stage 2 through to RIBA Stage 4 for all MEP services.
During the early stages iTS carried out various site surveys to ascertain the details of the existing MEP installations.
During the design stages iTS managed the incoming utility services design for all tenants, including provisions for future tenants.
iTS attended various coordination meetings with the architect, client and specialist sub-contractors to ensure all elements were managed and accounted for within iTS’s tendered design.
iTS had bi-weekly presence on site to attended progress meetings with the project team along with site inspections to monitor that the works were being carried out in line with the current drawings, schedules and specification.
Project Location:
Monks Cross Shopping Park, Huntington, York, YO32 9GX
Project Size:
36,232m² retail space
Client:
Monks Cross Shopping Park Trustees.
Monks Cross Shopping Park is home to Mothercare, Primark concept store, Clarks, Debenhams, H&M, Monsoon, Accessorize, New Look, River Island, Schuh, TK Maxx, Thomas Cook, WHSmith, Game, Laura Ashley, Costa, Pizza Hut, Starbucks, Carphone Warehouse, Evans Cycle, American Golf, EE, Boots and Superdrug.
Services Value:
Undisclosed
Project Description:
iTS designed services for a series of initiatives at Monks Cross Shopping Park including façade refurbishment, six new pod units and new retail units.
The entire façade has been modernised to provide a contemporary aesthetic for the existing shopfronts. The entrance features have been greatly enhanced by boxing them in illumined perforated cladding.
A pedestrianised 'street scene' was created to the north of the site by building four small kiosks between the existing retail frontage and the car park. These pods deliver six additional units to the park with minimal impact to the existing parking.
A further 2100m² retail unit is proposed to the south, creating a new gateway into the site.
Services Provided:
Design from RIBA Stage 2 through to RIBA Stage 4 for all MEP services.
Project Location:
Priory Point, Bedford
Project Size:
8,148m²
Services Value:
Undisclosed
Project Description:
Manufacturing facility. Secure site with 103 car spaces and fenced yard. 1,500 kVA power.
Services provided:
Project management.
Services Design.
Site inspections.
Site inspections.
Commissioning and sign off.
Industrial
Project Location:
Littlebrook Plot 3 & 4, The Powerhouse, London, DA1 5UR
Project Size:
Warehouse: 39715m²
Offices & Welfare (three storey): 2091m²
Gatehouse: 23m²
Total Area: 41829m²
Plot Area: 115700m²
Services Value:
Undisclosed
Project Description:
The Powerhouse is a massive warehouse unit boasting the tallest speculative build unit to complete in the UK in 2022. The building was built to BREEAM Excellent Standards, of the 227 parking spaces, 20% of these are EV chargers, a 55m yard depth and 21m of clear internal height. This makes the powerhouse a desirable rental for companies that would benefit with an increased volume of 40% over a unit with 15m eaves.
Services Provided:
Design from RIBA Stage 2 (shell and core) through to RIBA Stage 4 for all MEP services covering Cat A fit-out.
Building services design for unit 3.
Prepared a thermal model for BREEAM HEA 04.
Undertook daylight calculations.
Undertook a BRUKL review to ensure the building was on target for BREEAM and EPC A rating.
Undertook a final inspection in addition to issuing an EPC.
Liaised with utility companies to provide the incoming services.
Attended a total of 5 site based meetings, which included in inspections of works to make sure these were being designed inline with the current drawings, schedules and specification.
Project Location:
Units 1 & 4 East Horndon Business Park, Brentwood, CM13 3LS
Project Size:
Unit 1: 11580m²
Unit 4: 5110m²
Plot Area: 84984m²
Services Value:
Undisclosed
Project Description:
The project was to provide two large commercial units in East Horndon Business Park, descriptions of the units are as follows:
Unit 1: A large warehouse, with a 1280m² office area in addition to a 470m² undercroft area. In addition to external works such as hardstandings, car parking, road, landscaping, drainage and incoming utilities.
Unit 4: A large warehouse, with a 840m² office area in addition to a 560m² undercroft area. In addition to external works such as hardstandings, car parking, road, landscaping, drainage and site entrances.
Services Provided:
iTS progressed from a shell & core and design intent to RIBA Stage 4 as detailed in the Goodman specification and employers requirements. Providing full MEP service designs to both the office areas and cores.
Prepared a thermal model for BREEAM HEA 04.
Undertook daylight calculations.
Undertook a BRUKL review to ensure that the building was on target for BREEAM and EPC A rating.
Undertook a final inspection of the building and issued the buildings EPC.
iTS liaised with the utility companies to provide the incoming services.
Project Location:
Unit 5, New Industrial/Distribution Unit, BG 103, Burton Gateway, Burton upon Trent, DE13 8ED
Project Size:
Unit Size: 9575m²
Office Size: 542m²
Warehouse: 9033m²
Services Value:
Undisclosed
Project Description:
A 50 acre industrial and distribution site, the warehouse has a 50m yard depth and 8 dock level doors. 12.5m eave height, 117 car parking spaces. With a reception area on the ground floor and offices on the first and second floor.
Services Provided:
iTS conducted a non-intrusive MEP survey of the building to identify the existing services. The survey covered: Incoming utilities, electrical distribution, small power, lighting, fire alarm, heating, ventilation, air conditioning and domestic water services.
iTS reviewed available technical drawings and manuals.
iTS Provided a written report on MEP services including observations and recommendations.​
Education
Project Location:
St Albans Girls School
Project Size:
850m²
Services Value:
£1.75 Million.
Project Description:
The project consisted of a new build teaching block over two floors. The new teaching block provides 8 classrooms and a large open plan library.
Services Provided:
Design from RIBA Stage 2 through to RIBA Stage 4 for all MEP services.
The design included mechanical ventilation with heat recovery, wind-catchers, water services, underfloor heating, above ground drainage, electrical distribution, lighting, small power, data and fire alarms.
iTS attended project meetings and carried out site inspections throughout the construction period, to monitor works and ensure they were being carried out in accordance with the current drawings, schedules and specification.
This included witnessing various commissioning activities to ensure the system was operating as designed.
​
Project Location:
The Ridgeway, Sandringham School, St Albans
Project Size:
1,730m²
Client:
Sandringham School
Project Value:
£3.5 Million
Project Description:
The project consisted of multiple new build teaching buildings. This incorporated 12 extra-sized classrooms, an IT suite and 3 super-sized science laboratories, The project also features various offices, a seminar room, a network support room and a large open space on each floor. In addition to this a new maths, science and technology block.
Services Provided:
Design from RIBA Stage 2 through to RIBA Stage 4 for all MEP services.
The design included laboratory gas distribution, gas interlock air conditioning, mechanical ventilation with heat recovery, wind-catchers, CAT5 boosted cold water, hot water, underfloor heating, above ground drainage, electrical distribution, lighting, small power, data and fire alarms.
iTS had substantial on site presence to attended design meetings with the client and project team, to discuss and progress the design.
iTS attended project meetings and carried out site inspections throughout the construction period, to monitor works and ensure they were being carried out in accordance with the current drawings, schedules and specification.
iTS attended site to witness various commissioning activities along with the commissioning engineers to ensure the system was operating as designed.
​
Project Location:
Sandringham School, St Albans
Project Size:
525m²
Client:
Sandringham School
Services Value:
Undisclosed
Project Description:
The project consisted of a new build specialist drama block. The new block provides 3 specialist drama spaces.
Services Provided:
Design from RIBA Stage 2 to RIBA Stage 4 for all MEP services.
The design included mechanical ventilation with heat recovery, water services, air to water heat pump paired with underfloor heating, electrical distribution, lighting, small power & data and fire alarms. The air source heat pump system was designed to ensure compliance with renewable heat incentives (RHI) scheme.
iTS attended site throughout the construction period to attend project meetings and carry out site inspections, to monitor that the works were being carried out in line with the current drawings, schedules and specification. This included witnessing various commissioning activities to ensure the system was operating as designed.
Project Location:
University of Cambridge, Sanger Building
Project Size:
Undisclosed
Client:
University of Cambridge
Services Value:
Undisclosed
Project Description:
10 Gigabit network infrastructure upgrade
Services Provided:
Survey and feasibility study.
Electrical, Data, Mechanical and Structural Design.
Project management, Principle designer (CDM), Contract Administration.
Project Location:
Roger Needham Building, Cambridge
Project Size:
Undisclosed
Client:
University of Cambridge
Services Value:
Undisclosed
Project Description:
iTS is an approved consultant for The University of Cambridge.
Services Provided:
Survey and feasibility report on the replacement of lighting and controls.
Hotels
Project Location:
Bedford Swan Hotel And Thermal Spa
On the embankment of the beautiful Great River Ouse in Bedford, Bedfordshire, The Bedford Swan Hotel offers luxurious rooms. The stylish hotel is full of character. Mixing contemporary fabrics and design with the original 18th Century features to create a stunning venue for your hotel stay, business trip, wedding or conference.
Project Size:
Undisclosed
Services Value:
Undisclosed
Project Description:
We have been involved with works at this hotel for many years, projects vary from refurbishment of leisure facilities, hotel rooms, extensions for additional rooms and meeting facilities.
Services Provided:
M&E / MEP design from RIBA Stage 1 to 3. This consisted of incoming utilities, domestic water services, heating, ventilation, electrical distribution and power.
Undertook BRUKL, SBEM and EPC.
​
Project Location:
Manor of Walworth Hotel
Project Size:
Undisclosed
Client:
Tenergy Group
Services Value:
Undisclosed
Project Description:
Four storey new build accommodation hotel block located to the rear of the hotel. 14 en-suite bedrooms.
Services Provided:
Full design from RIBA Stage 1 to Stage 6.
Undertook BRUKL and predicted EPCs for the accommodation.
The design included mechanical ventilation, water services, air conditioning, above ground drainage, electrical distribution, lighting, small power & data and fire alarms.
iTS attended site throughout the construction period to attend project meetings and carry out site inspections, to monitor that the works were being carried out in line with the current drawings, schedules and specification. This included witnessing various commissioning activities to ensure the system was operating as designed.
Project Location:
Cromwell Hotel
Project Size:
Undisclosed
Client:
Optic Realm
Services Value:
Undisclosed
Project Description:
Review and inspection of existing domestic water and heating systems. Developing a design of an economical, efficient and reliable system replacement.
Services Provided:
Non-intrusive survey of the existing services.
Creation of a design proposal for the replacement of the existing services.
Detailed design of general arrangement drawings, schedules, schematics and a specification to create a competitive tender exercise.
Detail of basic builders work requirements.
Project Location:
Samuel Ryder Hotel, St Albans
Project Size:
Undisclosed
Client:
Avantis Hotels
Services Value:
Undisclosed
Project Description:
RIBA Stage 2 & 4 conversion of existing meeting rooms into suites in addition to replacement of plant room and heat emitters.
Services Provided:
MEP non-intrusive survey identifying existing services. Including drawings and MEP strategy.
Mechanical and electrical design of suites and plant room.
Specifications and schedules for MEP design.
Tender summary documents for pricing.
Unique
Project Location:
Wedding Cake, Waddesdon Manor
Project Size:
Undisclosed
Client:
Waddesdon Estate
Services Value:
Undisclosed
Project Description:
The project consisted of a new build three-storey building depicted to look as sculptured wedding cake.
Services Provided:
Design from RIBA Stage 3 through to RIBA Stage 6 for all electrical distribution, power & data, Lighting, fire alarm, containment, incoming domestic water services and MEP specification.
iTS produced 3D models of the site, analysing the landscape & façade lighting and producing in-depth calculations on RELUX.
iTS attended project meetings and carried out site inspections throughout the construction period, to monitor works and ensure they were being carried out in accordance with the current drawings, schedules and specification.
This included witnessing various commissioning activities to ensure the system was operating as designed.
​
Showrooms
Project Location:
BMW, Park Lane, London, W1K 7TT
Project Size:
​740m2
Services Value:
Undisclosed
Project Description:
In London's luxurious Mayfair district, BMW have opened a stunning new flagship showroom. This cutting-edge space is at 70 Park Lane. The showroom seamlessly blends luxury, performance, and innovation, creating a remarkable showcase for the world of BMW.
Services Provided:
Full design from RIBA Stage 1 to Stage 6.
The design included mechanical ventilation, water services, air conditioning, above ground drainage, electrical distribution, lighting, small power & data and fire alarms.
iTS attended site throughout the construction period to attend project meetings and carry out site inspections, to monitor that the works were being carried out in line with the current drawings, schedules and specification. This included witnessing various commissioning activities to ensure the system was operating as designed.
Project Location:
Volvo Romford
Project Size:
3,315m2 site
Services Value:
Undisclosed
Project Description:
The project consisted of the conversion of an existing site to form the new showroom for Volvo. The retailer’s new home also features multiple high speed electric charging points for its growing range of electric vehicles.
Services Provided:
Design from RIBA Stage 3 through to RIBA Stage 6 for all electrical distribution, power & data, lighting, fire alarm and containment.
​